PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at Elev. 5,6 (3rd Floor) Facing South-West (800x600).jpg Starting saw cutting Rahway Ave by the Administration building (800x600).jpg Welding beams at Derrick -3 (3rd Floor) Facing North (800x600).jpg Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600).jpg Continued excavation for the underground sanitary piping Facing East (800x600).jpg Continued saw cutting Rahway ave. under the bridge (800x600).jpg Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Sanitary piping at room 175A Facing East (800x600).jpg Sanitary piping at room 175B Facing North (800x600).jpg
Previous pageNext page Continued excavation for the underground sanitary piping Facing East (800x600)
Continued excavation for the underground sanitary piping Facing East (800x600)